User guide

Work: plans, jobs and problems

On this page: Jobs, plans and problems · Do first, Soon and Later · Plans · Jobs · Problems · The pages and History · What Today shows from Work · For assistants · When Work looks wrong

Work holds the jobs to do, the plans that keep making them, and the problems found aboard. This chapter gives the exact rules behind Do first, Soon and Later and what each action records, as of 2026-10-11.

Jobs, plans and problems

RecordWhat it isWhere it comes from
jobOne piece of work, done onceAdd job, a plan, or Schedule fix on a problem
planA repeating schedule that makes the next job each time one is doneAdd plan, or a suggested plan
problemSomething wrong, with a severity, open until fixed or set asideSomething's wrong, Record a problem, or a trip

Every job is one of three kinds. A one-off job is made with Add job and belongs to nothing. A plan's job is one occurrence of a plan; its title, items and checklists come from the plan. A fix is a job made by Schedule fix; it carries its problem as its reason.

The Work page has three tabs: To do (open and deferred jobs and the problems that need a decision, in three groups), Plans and History.

Do first, Soon and Later

Each row in To do is in exactly one group. Work, Today and an assistant's work_list read the same rules (src/taskUrgency.ts).

A job is inWhen
Do firstIts due date has passed. A date is stored at 09:00 on its day, so a job due today is overdue from 09:00.
Do firstIts equipment's latest engine-hours reading is at or above the job's due hours
SoonIts due date is within the next 30 days
SoonIts due hours are 10 hours or fewer above the latest reading
LaterIt is due more than 30 days and more than 10 engine hours away
LaterIt is due by engine hours and its equipment has no reading yet ("Waiting for a reading")
LaterIt has no due date and no due hours ("No due date")
LaterIt is deferred with Not now and the deferral still holds
A problem is inWhen
Do firstIts severity is High or Critical, whatever its status, until it is fixed or set aside
SoonIts severity is Low or Medium and it is Open or In progress
LaterIts severity is Low or Medium and you chose Keep watching

Within a group: overdue jobs, then jobs by due date, then problems by severity, then by title.

On a wide screen a job row in Do first or Soon carries Not now and Did the job, and a problem row Schedule fix. On a phone, and in Later, rows only open the record's page.

Plans

Add plan asks "What needs doing?", the equipment (or Whole boat) and Repeat by.

Repeat byChoicesFirst job
CalendarEvery number of days; Monthly, on a day of the month (every 1 to 120 months, on a day from 1 to 31 or the last day); Yearly, on a date; Every seasonFirst due: required for a number of days (a year from today unless changed); optional for the others, which then start on the next day they fall on
Engine hoursEvery (hours)First due at: optional. Left empty, the plan starts counting at the first reading you record.
With another planEvery Nth time the other plan comes round, optionally starting with time #None of its own: its job rides along with the other plan's job and shares its due date

A season falls due on its first day: spring 1 March, summer 1 June, autumn 1 September, winter 1 December in the northern hemisphere, and six months on in the southern.

The plan form makes a plan by calendar or by engine hours, not both. A plan with both comes only from an assistant (maintenance_plan_create), and its jobs are due by both. Editing such a plan in the app keeps only its engine-hours schedule.

What the next job is scheduled from

Each time a plan's job is done, the plan makes its next job at once, due as follows.

ScheduleNext due
Every number of daysThe interval counted from the day the job was done
Monthly, yearly or seasonalThe next day the rule falls on after the day the job was due, so finishing late does not move the schedule; slots that passed meanwhile are skipped
Engine hoursThe hours typed in Did the job plus the interval; with no hours typed, the job's due hours plus the interval
With another planIts job is added to the other plan's next job when the count falls on that occurrence

Pause, Resume and Archive

Suggested plans

Work's Plans tab and the equipment page offer Suggested plans for equipment of a known type. A diesel engine gets engine oil and filter, fuel filters, raw-water impeller, drive belt and alternator, and coolant and heat exchanger; many other types get their own.

Items, checklists and estimate

Jobs

Add job (Work's Add to Work menu, a project's page, the equipment page's Work section) asks "What needs doing?", the equipment (or Whole boat), Due and the project; the estimate and notes are under More details. A one-off job has a due date or none; this form cannot make it due by engine hours.

Edit is the pencil on the job's page. An open one-off job can change its title, due date, estimate, items and checklists. An open plan's job can change its own due date, due hours and estimate; its schedule, items and checklists are changed on the plan. A deferred or finished job can change only its project and notes, so a finished job can still be put under its project.

Not now

Not now defers a job On a date (any day after today; a week ahead by default) or, for equipment with an engine-hours meter, At an engine-hours reading above the current one, with an optional note.

The job moves to Later and leaves Today until the date passes or a reading reaches the hours. Not now never changes the due date: a job that was overdue is overdue again when the deferral ends.

Did the job

Did the job asks:

FieldWhat it records
Done onThe day, today or earlier
Engine hoursShown when the equipment has a meter or the plan repeats by hours, prefilled with the latest reading. It is recorded as a reading on the meter.
Cost, excluding items from stockIn the boat's currency. Above zero, it becomes a paid expense.
Paid toWho was paid; offered once a cost is typed
NoteWhat was done
Items usedThe job's items, ticked when in stock; the quantities are taken from stock
Photo or fileA service record, receipt or photo, kept as a document attached to the job
Mark the problem as resolvedFor a fix only, ticked by default

The form lists the job's checklists as completed, in progress or not run. A checklist not run does not stop you saving. A cancelled checklist run is ignored, so the job shows that checklist as not started again.

What a cost becomes. A cost above zero adds a paid expense in the same change: titled with the job, category Maintenance, paid on the day the job was done, Paid to as its vendor, linked to the job ("see expense" on its page), with the job's equipment and project while they are active. Items taken from stock are never added to the cost.

What a completion freezes. The job keeps the estimate it had when it was done, its own or its plan's. A later change to the plan's estimate does not rewrite what a finished job was estimated at.

Problems

Something's wrong (the Record menu, outside a trip) and Record a problem (Work's Add to Work menu, the equipment page) open one form. It asks a Short description and a Severity: Low, Medium (the default), High or Critical. More details holds More detail, Noticed at, Equipment, Trip and Notes. A problem found during a trip is covered in A trip.

A problem's status changes only through its actions, on its page or in its row's More menu.

ActionOfferedResult
Schedule fixUnfinished, no fix openA job titled "Fix:" and the problem's title, with the problem as its reason; the problem becomes In progress
Keep watchingUnfinished, no fix open, not already watchedWatching. A Low or Medium problem moves to Later and leaves Today.
Mark fixedUnfinished, no fix openFixed, with an optional "What was done?"
Not a problemUnfinished, no fix openNot a problem, at once, without a question
ReopenFixed or Not a problemOpen again; the fixed date and note are dropped

Schedule fix suggests a due date from the severity, which you can change:

SeveritySuggested due
CriticalToday
High7 days ahead
Medium30 days ahead
Low90 days ahead

While a fix is open the problem page says "A fix is scheduled. Finish or archive that job to change this." Doing the job with "Mark the problem as resolved" ticked marks the problem Fixed, with the job's note as its note.

The pages and History

Every job, problem and plan row opens its page at /work/<id>, even a finished or archived one, which is then read-only. The job page's Why says what the job fixes or which plan it belongs to, its project, "Last done" and its estimate; below come its items, reference documents, checklists, what was recorded when it was done, and its documents. The problem page says when and on which trip it was noticed, and names its fix. The plan page lists its Next job, What each job needs and the jobs Done under it.

Work's History tab lists finished jobs ("Did the job") and settled problems ("Fixed", "Not a problem"), newest first, 30 at a time with "Show all".

What Today shows from Work

Today's Do first and Soon hold the same jobs and problems as Work's, in Work's order, beside other facts such as papers, items to buy and checklists. Later is never on Today. Today shows five Do first rows and three Soon rows, with "Show all N". The Work badge in the navigation counts Work's Do first rows.

Two equipment facts sit beside them. They are not Work rows.

For assistants

If you are an assistant connected to LazyJack, these are the rules for work.

  1. Read work_list before proposing work. It answers Do first, Soon and Later as the Work page shows them, with each job's reason. Say which group a thing is in; do not re-rank.
  2. Never mark a job done or a problem fixed unasked. maintenance_task_complete, defect_update to resolved or dismissed, and maintenance_task_defer each change the record for good; confirm one record per answer.
  3. One call records a job done. maintenance_task_complete takes completedHours, cost, vendor, the items used and the documents; it makes the reading and the expense itself. Do not also call reading_record or expense_create for the same job.
  4. Not now needs a date or an engine-hours count (maintenance_task_defer); "later" is not a deferral.
  5. Something wrong is defect_create, with the equipment and a severity the owner agreed to; a fix is maintenance_task_create with the problem's defectId, never a second problem.
  6. A plan with both a calendar and an hours schedule can be made over MCP but not in the app, and the owner's Edit plan keeps only its hours schedule. Prefer one schedule unless the owner asks for both and knows this.
  7. Engine hours are not forecast. A job due by hours moves only when a reading is recorded; say "due at 2,500 h, now at 2,470 h", not a date.

When Work looks wrong

What you seeWhat it meansWhat to do
"Waiting for a reading"The job is due by engine hours and the equipment has no readingAdd a reading
"No due date" on a plan's jobAn hours plan made without "First due at" has had no reading yetAdd a reading; the plan sets the due hours from it
A job with its hours reached is in SoonIts due date is within 30 days, and the date is checked firstDo it, or move its date with Edit
A plan has no Next jobA job was done while the plan was pausedAdd a one-off job for now

Not in this chapter

The ideas behind statuses, Archive and Delete: How LazyJack thinks. Setting up the engine and accepting the first plans: Setting up the boat and engine. Problems and engine hours recorded during a trip: A trip. Items, stock and To buy: Inventory and To buy. How estimates, expenses and plans feed the forecast: Budget and projects. Documents attached to jobs and plans: Documents and papers. A Did the job that waits in Sync problems: Troubleshooting sync. Backup and restore: Backup, restore and moving devices. What an assistant may do: Assistants.

This chapter as Markdown · llms.txt